Completed

Crow Dam Spillway

A new chute, flip bucket and piano key weir spillway replaced badly deteriorated structures in two phases.

Timeline
2022
Location
Lower Crow Reservoir

Project overview

The Crow Dam Spillway Project consisted of two phases: Phase 1 of construction (Area 2) consisted of replacement of the badly deteriorated existing chute and stilling basin with a new chute, a flip bucket, and armored apron to dissipate the energy prior to discharging into Lower Crow Creek. The Phase 2 (Area 3) consisted of the replacement of the existing side-channel inlet structure and tunnel with a piano key weir spillway crest structure, sloped trough, channel crossing beneath Crow Dam Road that will tie into the new structures constructed in Area 2, and installation of a bridge at the Crow Dam Road crossing.

Photo Gallery

  • Photo Gallery, photo 1
  • Photo Gallery, photo 2
  • Photo Gallery, photo 3
  • Photo Gallery, photo 4
  • Photo Gallery, photo 5