Concept redesign by Antoxmedia for the DEWR website RFP. Not the official DEWR website. About this concept

Try the staff editor

Notice: Jocko Valley pipeline construction: expect construction vehicles and occasional traffic interruptions east of Highway 93. Roads affected

Completed

Falls Creek Diversion Replacement

New trash rack, gates and flow measurement for a highly degraded diversion on a major tributary of the North Fork Jocko.

Timeline
2025
Location
Falls Creek, Tabor Feeder Canal

Project overview

Falls Creek is a natural and ungauged stream along the Mission Mountain divide and is a major tributary to the North Fork of the Jocko River. The diversion is a reinforced concrete irrigation structure collecting and conveying surface water flows at its intersection within a concrete lined portion of the Tabor Feeder Canal. The diversion, made of a debris screen/rack, rectangular flume, check structure, and radial gates, is highly degraded and needs full replacement. As part of a Modernization Plan, recommendations include a new trash rack, radial gates, flap gates, and flow measurement structures. Debris management is expected to be a significant design parameter for the diversion structure. A modern system will include minimal maintenance requirements, improved operational flexibility, and long-term durability.

Video

Drone footage from DEWR, without narration. New videos with speech would carry captions and transcripts.

Photo Gallery

  • Photo Gallery, photo 1
  • Photo Gallery, photo 2
  • Photo Gallery, photo 3